LM Handling has successfully completed a number of projects since start up in 2012, working alongside fellow Acteon Group companies, as well as, on our own individual equipment hire and design projects. Below is a selection of our case studies to date.

23.08.15

LM Handling supplied an 96" ILT and operation crew to the Shah Deniz II project in the Caspian Sea. It was necessary for LM Handling to create an upgrade pack for the standard 48"-82" ILT, in order to meet the client's specifications. The ILT was used in handling the follower for the installation of 8 pin piles.

View

04.06.15

LM Handling supported sister company LDD, offering lifting and handling expertise and equipment on the Marin block project offshore West Africa. LM Handling used their brand new 600t Jacket Levelling Tool and two 48-84" Internal Lifting Tools to install all pin piles and level both jackets.

View

06.05.15

LM Handling has provided handling expertise and equipment to support Acteon sister company, InterMoor, in the successful mooring installation of a floating production, storage and offloading (FPSO) unit for the China National Offshore Oil Corporation (CNOOC) operated Enping 24-2 oilfield in the South China Sea.

View

14.07.13

In 2013, KM Handling built the StabFrame-S for the Kamelia FPSO mooring installation project in Malaysia

View

16.09.11

LM Handling completed the first StabFrame project on the Waimea development in the Campos Basin, Offshore Brazil.