Kamelia Field StabFrame-S Project

LM Handling built the StabFrame-S to install the FPSO mooring piles for the Kamelia FPSO in Malaysia for EMAS Pte.  MENCK led the pile installation package with LM Handling as its partner, where MENCK provided the hydraulic hammer and LM Handling the StabFrame-S, mud mat extensions and Internal Lifting Tools (ILTs).

Due to the relative short lead time, we were required to design and build the StabFrame-S complete with new mud mat extenions within 8 weeks.  The StabFrame-S was built in Singapore and ready in advance of the mobilisation date, exceeding client expectations.

The project was far from straight forward due to the very soft seabed, which required the mud mat extensions to ensure a stable footing for the StabFrame-S.

The StabFrame-S with its mud mats to distribute the loads, performed as expected, resulting in another successful project where new equipment was used.

 